CANELANDS TRUST

ADAPTION STRATEGY FOR SUGAR PROTOCOL
Location: Zimbabwe | Client: PGBI GROUP

Canelands Trust

Project Description

The PGBI Group was contracted by Canelands Trust to carry out a study in the Mkwasine Sugar Cane Estate in Zimbabwe. PGBI, in turn, appointed Greene Consulting Engineers (Pty) Ltd to assist with the study.

The potential supply of additional water to the Mkwasine Estate environs, through raising the Manjirenji and Siya dams and the construction of Mkwasine and Mukazi dams, was investigated. The potential 2011 USD costs involved were also examined.

Sources of water in the area have previously been investigated by the Ministry of Water Development. Canelands Trust endeavoured to make a first broad evaluation of the economics, routing and phasing of possible supply routes, as well as the method for delivering the water stored in the dams to land areas under consideration for the growing of sugar cane.


 

Project Scope

  • Scoping study for the construction of the Mkwasine and Mukazi dams and upgrade/raising of the Manjirenji dam wall
  • Desktop study to update the design data for three existing dams and preparation of a cost estimate for the refurbishment of these dams
  • The augmentation of water supply and assessment of various delivery systems from the identified supplies

 

Manjireni Dam

CT-dam_01





Mkwasine Dam

CT-dam_02




Mukasi Dam

CT-dam_03




Canal at Mkwasine Sugar Cane Estate

CT-dam_04



Total project value: US $ 44 million



  • Completion of Project

    100%